2023년 소방공사 표준품셈입니다.
목 차
제 1 편 공통사항
제 1 장 적용기준 ···················································································· 3
1-1-1 목적 ································································································ 3
1-1-2 적용범위 ························································································· 3
1-1-3 적용방법 ························································································· 3
1-1-4 특정기계 사용 ················································································· 4
1-1-5 수량의 계산 ···················································································· 4
1-1-6 금액의 단위표준 ············································································· 5
1-1-7 재료 및 자재의 단가 ······································································ 5
1-1-8 주요자재 ························································································· 5
1-1-9 재료의 할증률 ················································································· 6
1-1-9-1 강재류 ···················································································· 6
1-1-9-2 기타 재료 ··············································································· 7
1-1-9-3 전기재료의 할증률 및 철거손실률 ·········································· 8
1-1-10 공구손료 및 잡재료 ······································································ 9
1-1-11 발생재의 처리 ············································································ 10
1-1-12 노임 ···························································································· 10
1-1-13 노임의 할증 ················································································ 10
1-1-14 품의 할증 ··················································································· 11
1-1-15 작업반장 ····················································································· 18
1-1-16 품질관리비 ·················································································· 19
1-1-17 산업안전보건관리비 ···································································· 19
1-1-18 산업재해보상 보험료 및 기타 ····················································· 19
1-1-19 사용료 ························································································ 19
1-1-20 소운반의 운반거리 ······································································ 20
1-1-21 지하지반의 추정 ········································································· 20
1-1-22 화물자동차의 적재량 ··································································· 20
1-1-23 운반 및 수송 ·············································································· 23
1-1-24 인력운반 ····················································································· 26
1-1-25 종합시운전 및 조정비 ································································· 27
1-1-26 강재배관의 부자재 산정요율 ······················································· 27
1-1-26-1 일반업무용 건물 ································································· 27
1-1-26-2 병원건물 ············································································· 30
1-1-27 표준품셈 보완실사 ······································································ 31
1-1-28 환경관리비 ·················································································· 32
1-1-29 현장시공 상세도면의 작성 ·························································· 33
1-1-30 안전관리비 ·················································································· 33
1-1-31 시공직종 ····················································································· 33
1-1-31-1 기술자 및 관리자 ······························································· 33
1-1-31-2 직종 구분 ··········································································· 34
1-1-32 안전관련 신호수 등 ···································································· 34
제 2 편 공통공사
제 1 장 가설공사 ·················································································· 37
2-1-1 규준틀 ·························································································· 37
2-1-1-1 토공의 비탈 규준틀 ······························································ 37
2-1-1-2 수평 규준틀 ·········································································· 37
2-1-2 구조물 동바리 ··············································································· 38
2-1-2-1 토공의 비탈 규준틀 ······························································ 38
2-1-2-2 알루미늄 폼 동바리 ······························································ 38
2-1-3 구조물 비계 ·················································································· 39
2-1-3-1 강관비계 ··············································································· 39
2-1-3-2 시스템비계 ············································································ 39
2-1-3-3 강관틀 비계 ·········································································· 40
2-1-3-4 강관 조립말비계(이동식) ······················································· 40
2-1-3-5 가설계단 ··············································································· 41
2-1-3-6 손율 ······················································································ 42
2-1-3-7 비계용 브라켓 ······································································ 42
2-1-4 수직보호막 ···················································································· 43
2-1-4-1 비계주위 보호막 ··································································· 43
2-1-4-2 방진망 ·················································································· 43
2-1-5 건축물 보양 ·················································································· 44
2-1-6 건축물 현장정리 ··········································································· 44
제 2 장 토목 및 기타공사 ···································································· 45
2-2-1 굴착 ······························································································ 45
2-2-1-1 터파기 ·················································································· 45
2-2-2 인력 흙 다지기 ············································································· 46
제 3 장 철근 콘크리트 공사 ································································· 47
2-3-1 콘크리트 타설 ··············································································· 47
2-3-1-1 콘크리트 타설 ······································································ 47
2-3-2 거푸집 ·························································································· 48
2-3-2-1 합판 거푸집 ·········································································· 48
제 4 장 도로포장 및 유지 ···································································· 51
2-4-1 신설포장 ······················································································· 51
2-4-1-1 아스콘 포장 ·········································································· 51
2-4-1-2 콘크리트 포장 ······································································ 54
제 5 장 미장공사 ·················································································· 58
2-5-1 모르타르 바름 ··············································································· 58
2-5-1-1 모르타르 배합 ······································································ 58
2-5-1-2 모르타르 바름 ······································································ 58
제 6 장 펌프설치 ·················································································· 60
2-6-1 펌프설치 ······················································································· 60
2-6-1-1 일반펌프 ··············································································· 60
2-6-1-2 집수정 배수펌프 ··································································· 61
2-6-1-3 원심펌프(2단) ······································································· 61
2-6-2 펌프 방진가대 설치 ······································································ 62
제 7 장 건축방재공사 ··········································································· 63
2-7-1 점검구 설치 ·················································································· 63
2-7-2 각종 잡철물 제작 설치 ································································· 63
2-7-3 강재창호 설치 ··············································································· 65
2-7-4 내화충전재 ···················································································· 65
제 8 장 소방시설 내진공사 ··································································· 66
2-8-1 소방시설의 내진설비 흔들림 방지 버팀대 설치 ···························· 66
2-8-2 소방펌프 내진스토퍼 설치 ···························································· 66
제 9 장 임시소방시설 ··········································································· 67
2-9-1 간이소화장치 ················································································ 67
2-9-2 임시소방시설 비상경보장치 ··························································· 67
2-9-3 간이피난유도선 ············································································· 67
제 10 장 측 량 ·················································································· 68
2-10-1 항공사진촬영 ·············································································· 68
2-10-1-1 디지털항공사진 지상표본거리(GSD)별 제원 ······················· 68
2-10-1-2 월별천후표 ·········································································· 70
2-10-1-3 운항속도 ············································································· 71
2-10-1-4 예비운항시간 ······································································ 71
2-10-1-5 항공사진 촬영기준 계산식 ·················································· 72
2-10-1-6 항공사진촬영 ······································································ 73
2-10-1-7 항공사진자동독취 및 DB구축 ············································· 77
2-10-2 대공표지 ····················································································· 78
2-10-3 사진 기준점 측량 ······································································· 79
2-10-4 수치지도 작성 ············································································ 80
2-10-4-1 수치도화 ················································································· 80
2-10-4-2 수동입력 ················································································· 82
2-10-4-3 자동입력 ················································································· 83
2-10-4-4 정위치 편집 ··········································································· 86
2-10-4-5 도면제작 편집 ···································································· 88
2-10-4-6 구조화 편집 ········································································ 94
2-10-4-7 지하시설물도 작성 ······························································ 98
2-10-4-8 공통주제도 작성 ······························································· 102
2-10-4-9 수치표고자료 구축 ···························································· 105
2-10-4-10 영상지도제작 ·································································· 113
2-10-4-11 3차원 국토공간정보구축 ················································· 116
2-10-4-12 기본지리정보구축 ··························································· 120
2-10-5 건물 및 지상물체 항공사진 「판독작업」 ··································· 122
2-10-6 지도제작(기본도) ······································································· 123
2-10-6-1 지리조사 ··········································································· 123
2-10-6-2 편집 및 제도 ···································································· 124
제 3 편 소방 배관공사
제 1 장 소방 기계분야 배관공사 ························································ 129
3-1-1 배관공사 ····················································································· 129
3-1-1-1 슬리브설치 ·········································································· 129
3-1-1-2 금속관 배관 ········································································ 130
3-1-1-3 비금속관 배관 ···································································· 139
3-1-2 배관부속품 및 밸브 장치 설치 ··················································· 142
3-1-2-1 밸브 ···················································································· 142
3-1-2-2 플랙시블 이음 및 팽창이음 ················································ 143
3-1-2-3 인서트(insert) 설치 ···························································· 144
3-1-3 단열공사(보온, 보냉, 방로) ························································· 145
3-1-3-1 일반마감 배관보온 ······························································ 145
3-1-3-2 함석마감 보온 ···································································· 147
3-1-3-3 덕트 보온 ··········································································· 150
3-1-3-4 발열선 ················································································ 151
3-1-4 도장 및 방청공사 ······································································· 152
3-1-4-1 도장 면적환산 ···································································· 152
3-1-4-2 바탕만들기 ·········································································· 152
3-1-4-3 녹막이 페인트 칠 ······························································· 153
3-1-4-4 유성페인트 칠 ···································································· 153
3-1-5 기계설비 철거 및 이설공사 ························································ 154
3-1-6 가스설비 배관공사 ······································································ 155
3-1-6-1 가스설비 강관 ···································································· 155
3-1-6-2 PE관 ·················································································· 158
3-1-7 부대공사 ····················································································· 162
3-1-7-1 배관을 위한 구멍 뚫기(Ⅰ ) ················································· 162
제 2 장 소방 전기분야 배관공사 ························································ 163
3-2-1 전선관 배관 ················································································ 163
3-2-2 전선관 부속품률 ········································································· 164
3-2-3 박스(BOX) 설치 ········································································· 165
3-2-3-1 박스용 연결접지(Bond Earth)선 ········································ 166
3-2-4 풀박스(Pull Box) 설치 ······························································· 166
3-2-5 금속덕트 설치 ············································································ 167
3-2-6 케이블 트레이 및 랙 설치 ·························································· 168
3-2-6-1 조립식 케이블트레이 설치 ·················································· 168
3-2-7 몰딩(Molding) 설치 ··································································· 169
3-2-8 PC암거 설치 ·············································································· 169
3-2-9 시스템박스(System Box) 설치 ·················································· 170
3-2-10 플로어덕트 설치 ······································································· 170
제 3 장 소방 정보통신분야 배관공사 ················································· 171
3-3-1 구내 통신배관 ············································································ 171
3-3-1-1 구내 통신배관 ···································································· 171
3-3-1-2 전선관 부속품률 ································································· 172
3-3-2 단자함 ························································································ 172
3-3-2-1 단자함 ················································································ 172
3-3-2-2 배선반 ················································································ 173
3-3-2-3 중간 절체반 ········································································ 174
3-3-3 관로 ···························································································· 176
3-3-3-1 PVC관 ················································································ 176
3-3-3-2 PVC관 절개 및 절단 ························································· 177
3-3-3-3 합성수지관(파형관 포함) ····················································· 177
3-3-3-4 흄관 및 강관 ······································································ 178
3-3-3-5 도관전선관 ·········································································· 179
3-3-3-6 경고표시 테이프 및 매설표지판 ········································· 179
3-3-3-7 통신용 관로 등 청소 ·························································· 179
3-3-4 맨 홀 ·························································································· 180
3-3-4-1 조립식 인・ 수공 ·································································· 180
3-3-4-2 인・ 수공 철개 및 입상관 ····················································· 180
3-3-4-3 인・ 수공케이블 지지철물 ····················································· 181
3-3-4-4 관구마개 ············································································· 181
3-3-5 액세스플로어(Access Floor) ····················································· 182
제 4 장 부대공사 ················································································ 183
3-4-1 부대공사(앙카볼트 설치 등) ························································ 183
3-4-2 배관을 위한 구멍 뚫기(Ⅱ ) ························································· 185
3-4-2-1 배관용 구멍 뚫기 ······························································· 185
3-4-2-2 배관용 구멍 뚫기(손파기 기준) ·········································· 185
3-4-2-3 덕트용 구멍 뚫기 ······························································· 186
3-4-2-4 강재 구멍 뚫기 ·································································· 186
제 4 편 소방 배선공사
제 1 장 소방 전기분야 배선공사 ························································ 189
4-1-1 지중케이블 설치 ········································································· 189
4-1-1-1 관로청소 및 도통시험 ························································· 189
4-1-1-2 Piece test ········································································ 189
4-1-2 케이블 금구류 취부 ···································································· 190
4-1-3 옥내배선 ····················································································· 191
4-1-4 전력케이블 구내 설치 ································································· 191
4-1-5 언더카페트 케이블(전력용 후래트 케이블) 설치 ························· 192
4-1-6 제어용 케이블 설치 ···································································· 193
4-1-7 600V 비닐절연 비닐시이즈 케이블 평형(VVF) 설치 ·················· 194
4-1-8 600V 비닐절연 비닐시이즈 케이블 원형(VVR) 설치 ················· 194
4-1-9 분전반 조립 및 설치 ·································································· 195
4-1-10 차단기 및 개폐기 설치 ····························································· 196
4-1-11 가전기구 설치 ·········································································· 197
4-1-12 배선기구 설치 ·········································································· 198
4-1-12-1 콘센트류 ··········································································· 198
4-1-12-2 스위치류 ··········································································· 199
4-1-13 조명기구 설치 ·········································································· 200
4-1-13-1 형광등기구 설치 ······························································· 200
4-1-13-2 방전등기구(형광등 제외) 설치 ·········································· 203
4-1-13-3 LED유도등 설치 ······························································ 204
4-1-13-4 LED조명용 전원공급장치 설치 ········································· 204
4-1-14 옥내 잡공사 ·············································································· 205
4-1-15 Heat Tracing System 설치 ·················································· 206
4-1-16 배선용 단자함 설치 ·································································· 206
4-1-17 자가발전기 설치 ······································································· 207
4-1-18 무정전 전원장치(UPS, CVCF) 설치 ········································ 208
4-1-18-1 무정전 전원장치(UPS, CVCF) 점검 ································ 208
4-1-18-2 서지보호기(SPD) 설치 ····················································· 209
4-1-19 방화구획재 시공 ······································································· 209
제 2 장 소방 정보통신분야 배선공사 ················································· 210
4-2-1 광섬유 케이블 ············································································ 210
4-2-1-1 광섬유 케이블 포설 ···························································· 210
4-2-1-2 광섬유 케이블 접속(성단) 및 시험 ····································· 212
4-2-1-3 구내 광섬유 케이블 ···························································· 214
4-2-2 꼬임 케이블 ················································································ 216
4-2-2-1 꼬임 케이블 포설 ······························································· 216
4-2-2-2 커넥터 및 Jack 접속 ························································· 217
4-2-2-3 Patch Panel 및 성단 등 ·················································· 217
4-2-3 제어용 케이블 ············································································ 219
4-2-4 전원케이블 ·················································································· 220
4-2-4-1 통신용 구내 전력케이블 ····················································· 220
4-2-4-2 통신용 전력케이블 직선접속 ··············································· 221
4-2-4-3 통신용 전력케이블 단말처리 ··············································· 222
4-2-5 인입선(점퍼선) ············································································ 223
4-2-5-1 FTTH 인입선 ····································································· 223
4-2-5-2 점퍼선 구성품 ···································································· 223
4-2-6 홈네트워크 및 홈 오토메이션 신설 ············································ 224
4-2-6-1 무선수신기(세대 비상용) 설치 ············································ 224
4-2-6-2 경비실기 ············································································· 224
4-2-7 객실관리 시스템 신설 ································································· 225
4-2-7-1 중앙 제어 시스템 ······························································· 225
4-2-7-2 객실내 시스템 ···································································· 226
제 5 편 소화기구 및 장치공사
제 1 장 자동소화장치 ········································································· 229
5-1-1 자동소화장치 설치 ······································································ 229
제 6 편 수계 소화설비공사
제 1 장 옥내소화전설비 ······································································ 233
6-1-1 옥내소화전 설치 ········································································· 233
제 2 장 옥외소화전설비 ······································································ 234
6-2-1 옥외소화전 설치 ········································································· 234
제 3 장 스프링클러설비 ······································································ 235
6-3-1 스프링클러 설치 ········································································· 235
6-3-2 소방용 신축배관 설치 ································································· 236
6-3-3 간이스프링클러 설치 ··································································· 236
6-3-3-1 간이스프링클러 패키지형 ···················································· 236
6-3-3-2 시험밸브함 설치 ································································· 236
제 7 편 가스계 소화설비공사
제 1 장 가스계 소화설비 ···································································· 239
7-1-1 가스계 소화설비 ········································································· 239
7-1-2 기밀시험 ····················································································· 240
제 8 편 경보설비공사
제 1 장 자동화재탐지설비 ·································································· 243
8-1-1 자동화재탐지설비 설치 ······························································· 243
제 2 장 비상방송설비 ········································································· 245
8-2-1 비상방송설비 ·············································································· 245
8-2-2 방송공동수신설비 ········································································ 246
8-2-2-1 전파수신상태조사 ································································ 246
8-2-2-2 증폭기 ················································································ 246
8-2-2-3 분배기 및 분기기 ······························································· 247
8-2-3 지능형 홈네트워크 설비 ····························································· 249
8-2-3-1 홈네트워크 ·········································································· 249
8-2-3-2 홈오토메이션 ······································································ 249
제 9 편 피난구조설비공사
제 1 장 피난기구 ················································································ 253
9-1-1 완강기 설치 ················································································ 253
9-1-2 승강식 피난기 설치 ···································································· 253
제 10 편 소화활동설비공사
제 1 장 제연설비 ················································································ 257
10-1-1 덕트 설비 ················································································· 257
10-1-1-1 덕트 설치 ········································································· 257
10-1-1-2 부속기기 설치 ·································································· 262
10-1-2 송풍기 ······················································································ 265
10-1-2-1 송풍기 설치 ······································································ 265
10-1-3 자동제어 설비 ·········································································· 266
10-1-3-1 자동제어기기 설치 ···························································· 266
10-1-3-2 계기반 ·············································································· 267
10-1-3-3 플랜트 계기 ······································································ 268
10-1-3-4 압축공기 발생장치 및 공기관 배관 ·································· 270
10-1-3-5 중앙처리장치(CPU) 설치 ·················································· 270
10-1-3-6 입・ 출력장치(I/O Equipment)설치 ··································· 271
10-1-3-7 콘솔(Console)설치 ··························································· 271
10-1-4 시운전 ······················································································ 272
10-1-4-1 시운전 ·············································································· 272
10-1-4-2 건물의 냉난방 및 공조설비 정밀진단(TAB) ····················· 272
제 2 장 무선통신보조설비 ·································································· 273
10-2-1 동축 케이블 ·············································································· 273
10-2-1-1 동축 케이블 포설 ····························································· 273
10-2-1-2 커넥터 ·············································································· 274
10-2-2 방사형 및 누설동축케이블 ························································ 274
10-2-2-1 방사형 및 누설동축케이블 ················································ 274
10-2-2-2 커넥터 ·············································································· 275
제 11 편 플랜트 소방설비 공사
제 1 장 플랜트 배관 ·········································································· 279
11-1-1 플랜트 배관 설치 ····································································· 279
11-1-2 관만곡(Pipe Bending) 설치 ···················································· 291
11-1-3 밸브 취부 ················································································· 294
11-1-3-1 Screwed Type ······························································· 294
11-1-3-2 Welder-Back Screwed Type ······································ 294
11-1-3-3 Flange Type ··································································· 295
11-1-4 Fitting 취부 ············································································· 296
11-1-4-1 Screwed Type ······························································· 296
11-1-4-2 Flange Type ··································································· 297
11-1-5 Flange 취부 ············································································ 298
11-1-5-1 Screwed Type ······························································· 298
11-1-5-2 Seal Welded Screwed Type ······································· 299
11-1-5-3 Slip-on Flange Welded Type ····································· 300
11-1-6 장거리 배관 ·············································································· 301
11-1-7 이중보온관 설치 ······································································· 302
11-1-7-1 이중보온관 부설 ······························································· 302
11-1-7-2 이중보온관 용접 ······························································· 304
제 2 장 플랜트 용접 ·········································································· 306
11-2-1 강관절단 ··················································································· 306
11-2-2 강판절단 ··················································································· 308
11-2-3 강관용접 ··················································································· 310
11-2-3-1 전기아크용접 ···································································· 310
11-2-3-2 TIG(Tungsten Inert Gas) 용접 ····································· 312
11-2-4 강판 전기아크용접 ···································································· 315
11-2-4-1 전기아크용접(V형) ···························································· 315
11-2-4-2 전기아크용접(U형) ···························································· 316
11-2-4-3 전기아크용접(H형) ···························································· 317
11-2-4-4 전기아크용접(X형) ···························································· 318
11-2-4-5 전기아크용접(Fillet용접) ··················································· 319
11-2-5 예열(Electric Resistance Heating) ······································· 321
11-2-6 응력제거 ··················································································· 323
11-2-6-1 Induction Heating Device ············································ 323
11-2-6-2 Ring Burner, Electric, Resistance Heating Device ···· 324
11-2-7 플랜트 용접 개소 비파괴시험 ··················································· 326
11-2-7-1 방사선 투과시험 ······························································· 326
11-2-7-2 액체 침투탐상시험 ···························································· 327
11-2-7-3 자분탐상시험 ···································································· 328
11-2-7-4 초음파탐상시험 ································································· 328
11-2-8 아세틸렌량의 환산 ···································································· 329
제 3 장 배관 및 기기보온 ·································································· 330
11-3-1 pipe보온 ·················································································· 330
11-3-1-1 보온두께 30mm이하 ······················································· 330
11-3-1-2 보온두께 31mm∼40mm ··············································· 332
11-3-1-3 보온두께 41mm∼60mm ··············································· 334
11-3-1-4 보온두께 61mm∼75mm ··············································· 336
11-3-1-5 보온두께 76mm∼90mm ··············································· 338
11-3-2 기기보온 ··················································································· 341
11-3-2-1 Boiler 본체보온 ······························································· 341
11-3-2-2 Duct보온 ········································································· 342
제 4 장 강재 제작 설치 ····································································· 343
11-4-1 보통 철골재 ·············································································· 343
11-4-1-1 철골재의 무게산출 표준 ··················································· 343
11-4-1-2 부속재의 비율 ·································································· 343
11-4-2 철골 가공조립 ·········································································· 344
11-4-2-1 강판 구멍뚫기 ·································································· 344
11-4-2-2 앵커 볼트 설치 ································································ 344
11-4-3 STORAGE TANK ··································································· 345
11-4-3-1 탱크제작 ··········································································· 345
11-4-3-2 탱크조립설치 ···································································· 346
11-4-4 강재류 조립설치 ······································································· 350
11-4-5 도장 및 방청공사 ····································································· 350
11-4-6 기계설비 철거 및 이설공사 ······················································ 350
11-4-7 탱크청소 ··················································································· 351
제 5 장 화력발전 기계설비 ································································ 352
11-5-1 덕트제작(Air, Gas) ·································································· 352
11-5-2 덕트 설치 ················································································· 353
11-5-3 Soot Blower ··········································································· 354
11-5-4 Fan 설치 ················································································· 355
11-5-5 발전기 설치 ·············································································· 356
11-5-6 펌프 설치 ················································································· 359
11-5-6-1 원심펌프(2단, 플랜트) ······················································ 359
11-5-6-2 원심펌프(2단 대용량, 플랜트) ·········································· 359
11-5-6-3 Rotary Pump, Centrifugal pump(3,4 stage) ············· 360
제 6 장 수력발전 기계설비 ································································ 361
11-6-1 발전기 설치 ·············································································· 361
11-6-1-1 직종별 설치품 ·································································· 361
11-6-1-2 공정별 설치품 ·································································· 361
2025년 소방공사 품셈 (0) | 2025.01.13 |
---|---|
2024년 소방공사 표준품셈 (0) | 2024.01.11 |
2022년 소방공사 표준품셈 (0) | 2022.01.27 |
2021년 소방공사 표준품셈 (0) | 2021.02.06 |
「소방시설공사업법 시행령」개정 공포 알림 (0) | 2020.09.10 |